|
|
Log in / Subscribe / Register

Completing and merging core scheduling

Completing and merging core scheduling

Posted May 14, 2020 20:23 UTC (Thu) by jdesfossez (subscriber, #123831)
In reply to: Completing and merging core scheduling by jtaylor
Parent article: Completing and merging core scheduling

You are correct that linpack alone doesn't have this issue when the system is not overcommitted (and actually benefit from smt off). However, in this case, it is running concurrently with 96 1-vcpu noise VMs on the same NUMA node (3:1 overcommit that becomes 6:1 with smt off). I clarified this above for the MySQL benchmark, but the linpack benchmark was running in the same configuration.


to post comments


Copyright © 2026, Eklektix, Inc.
Comments and public postings are copyrighted by their creators.
Linux is a registered trademark of Linus Torvalds